Sciact
  • EN
  • RU

Results of Operation of the Test Accelerator Facility for the SKIF Linear Accelerator Full article

Journal Physics of Particles and Nuclei Letters
ISSN: 1547-4771 , E-ISSN: 1531-8567
Output data Year: 2024, Volume: 21, Number: 3, Pages: 271-277 Pages count : 7 DOI: 10.1134/s1547477124700110
Authors Arsentyeva M.V. 1,2,3 , Levichev A.E. 1,2,3 , Batrakov A.M. 1 , Volkov V.N. 1 , Ma X.C. 1 , Meshkov O.I. 1,3 , Nikiforov D.A. 1,2 , Pavlenko A.V. 1 , Barnyakov A.M. 1 , Kondakov A.A. 1 , Kotov E.S. 1 , Pavlov O.A. 1 , Chekmenev D.I. 1 , Samoylov S.L. 1,2 , Semenov A.M. 1,4 , Schegolkov N.S. 1
Affiliations
1 Budker Institute of Nuclear Physics, Siberian Branch, Russian Academy of Sciences, 630090, Novosibirsk, Russia
2 Synchrotron Radiation Facility SKIF, Boreskov Institute of Catalysis, Siberian Branch, Russian Academy of Sciences, 630559, Koltsovo, Russia
3 Novosibirsk State University, 630090, Novosibirsk, Russia
4 Novosibirsk State Technical University, 630073, Novosibirsk, Russia

Funding (1)

1 Ministry of Science and Higher Education of the Russian Federation FWUR-2024-0041

Abstract: The first stage of the linear accelerator of the Siberian Circular Photon Source (SKIF) accelerator facility has been successfully commissioned at the Budker Institute of Nuclear Physics, Siberian Branch, Russian Academy of Sciences (BINP). This test accelerator facility includes the radiofrequency (RF) gun, magnet system, RF accelerating structures, and diagnostic and control system elements. The aim of the work at the facility is to verify the correctness of solutions chosen for the accelerator design, as well as to get operation experience and to measure the beam parameters that will determine the successful work of the overall SKIF complex. This article describes the main subsystems of the test accelerator facility and briefly presents the first operation results concerning the beam parameters.
Cite: Arsentyeva M.V. , Levichev A.E. , Batrakov A.M. , Volkov V.N. , Ma X.C. , Meshkov O.I. , Nikiforov D.A. , Pavlenko A.V. , Barnyakov A.M. , Kondakov A.A. , Kotov E.S. , Pavlov O.A. , Chekmenev D.I. , Samoylov S.L. , Semenov A.M. , Schegolkov N.S.
Results of Operation of the Test Accelerator Facility for the SKIF Linear Accelerator
Physics of Particles and Nuclei Letters. 2024. V.21. N3. P.271-277. DOI: 10.1134/s1547477124700110 WOS Scopus РИНЦ OpenAlex publication_identifier_short.sciact_skif_identifier_type
Original: Арсентьева М.В. , Левичев А.Е. , Батраков А.М. , Волков В.Н. , Ма С.Ч. , Мешков О.И. , Никифоров Д.А. , Павленко А.В. , Барняков А.М. , Кондаков А.А. , Котов Е.С. , Павлов О.А. , Чекменев Д.И. , Самойлов С.Л. , Семенов А.М. , Щегольков Н.С.
Результаты работы стенда линейного ускорителя СКИФ
Письма в журнал "Физика элементарных частиц и атомного ядра". 2024. Т.21. №3(254). С.334–341. publication_identifier_short.sciact_skif_identifier_type
Dates:
Submitted: Sep 15, 2023
Accepted: Nov 24, 2023
Published print: Jun 7, 2024
Published online: Jun 7, 2024
Identifiers:
Web of science: WOS:001241405200054
Scopus: 2-s2.0-85195691702
Elibrary: 68116771
OpenAlex: W4399437341
publication_identifier.sciact_skif_identifier_type: 3822
Citing: Пока нет цитирований
Altmetrics: